office, building, business, blue sky, office buildings, office building, architecture, modern, glass, blue, sky, exterior, city, design, construction, office building exterior, corporate, work, nature, structure, urban, new, downtown, facade, business building, commercial, workplace, window, blue office, blue work, blue construction, blue window. Commercial property mistakes that sit quiet until a loss exposes them
Photo by ClickerHappy on Pixabay

Guides

Part of How commercial property coverage works

Commercial property mistakes that sit quiet until a loss exposes them

Commercial property mistakes stay free until the day of a loss: stale values, coinsurance, the lease boundary, and what the schedule never mentioned.

Property mistakes have long fuses. Each of the nine below is made on an ordinary day, costs nothing at the time, and stays invisible until the day of a loss, when it turns into a number.

They are grouped by when they are made rather than listed in a row, because the moment of the mistake is usually the only moment it can be fixed cheaply.

What to take away

  • The lease decides more about your property insurance than your policy does. Read it first.
  • Values that were right when you set them are wrong now. Nothing in the system updates them for you.
  • Building work, an empty unit, and a new activity all change the risk you described. None of them tells your insurer.
  • After a loss, tidying up too thoroughly destroys the evidence your own claim is built from.

When you sign the lease

1. Assuming the landlord's policy covers what you installed. The fit-out you paid for is usually your problem rather than the building owner's, and it is frequently the largest uninsured item in a leased space. Walk the unit and ask what was there before you arrived and what you added.

Lease clauses vs insurance cover

Lease clause

Fit-out
You funded it
Repair obligation
Wider than cover
Rent continuation
Rent while unusable

Insurance gap

Fit-out
Often uninsured
Repair obligation
Restore uninsured items
Rent continuation
Cost starts at loss

The fix: list the improvements you funded, get them onto your schedule, and check what the lease says happens to them at the end of the term.

2. Agreeing to obligations your insurance does not follow. Two clauses do the damage. A repair obligation wider than the cover you hold makes you responsible for restoring things you never insured. A clause continuing your rent while the premises are unusable creates a cost that starts on the day of the loss.

The fix: read the repair, insurance, and rent clauses as one problem, and ask your broker in writing whether the policy answers each. Matching a contract demand to a specific part of a policy is the subject of the property requirements guide.

When you set the values

3. Insuring the number you paid, the number in the accounts, or the number on the tax notice. All three measure something other than what it would cost to rebuild and re-equip. Land value, depreciation, and assessment practice each pull them away from the figure a claim is settled against.

Annual schedule reconciliation

  • Reconcile schedule against fixed asset register
  • Add new locations the week they open
  • Tell broker about seasonal stock peaks
  • Declare customer goods on site

The fix: build the figure from rebuilding cost and replacement of contents. A valuation prepared for insurance purposes is a normal thing to commission, and the reasons it matters are set out in the property overview.

4. Setting the schedule once and never touching it. Equipment gets bought, stock levels grow, a second location opens, a mezzanine goes in. The schedule stays exactly as it was and the gap widens quietly every year.

The fix: reconcile the schedule against your fixed asset register annually, and add new locations the week they open. While you are there, tell your broker about seasonal stock peaks and about any goods on site that belong to customers, since an average figure serves neither well.

5. Insuring the building and ignoring what it earns. Rebuilding is the visible loss. Not trading during the rebuild is often the larger one, and it is a separate part of the cover with its own mechanics.

The fix: work out how long you would really be out of action, including permits, lead times, and getting customers back, then check that against what your policy contemplates. Make sure your accounts could prove the loss, using the record described in the property checklist, and keep them reachable when the building is not, which is the point of the Ready.gov material on financial preparedness.

When the building changes

6. Starting work without telling anyone. A refit turns alarms off, opens the building up, brings contractors and hot work onto the site, and sometimes changes what the space is used for. Policies commonly contain conditions about named protective systems being maintained and about changes in occupancy.

Notify broker before work starts

  • Alarms turned off during refit
  • Building opened up to contractors
  • Hot work on site
  • Change of occupancy or use
  • Protective systems out of service

The fix: make notifying the broker part of the project plan, before the first contractor arrives. Ask specifically what the policy says about protective systems being out of service.

7. Letting a unit stand empty and saying nothing. Buildings that are vacant or unoccupied are commonly treated differently, and the definition sits in the wording rather than in common sense. A space between tenants, a seasonal closure, or a site awaiting sale can each engage it.

The fix: ask what your policy says about vacancy before the space empties, and find out what would need to change if it stays empty.

When the weather is coming

8. Discovering your storm deductible during the storm. Deductibles for certain perils are often structured differently from the flat amount that applies to everything else, and they can be applied location by location. That is not something to learn in the middle of a claim.

Storm deductible questions

  • Which perils carry a different deductible
  • What triggers the different structure
  • How it applies at each site
  • Prepare for the season, not the forecast

The fix: ask which perils carry a different deductible structure at each of your sites and what triggers it. Then prepare for the season rather than for the forecast, using the Ready.gov material on severe weather as a starting point.

When something has actually happened

9. Cleaning up too well. After the event the instinct is to clear the site and get repairs moving. Both instincts are right about the business and wrong about the claim if the damaged property has gone and permanent repairs are finished before anyone has seen them.

After a loss: preserve the claim

  1. Make the site safe
  2. Prevent further damage
  3. Photograph everything
  4. Keep damaged items until inspected
  5. Separate emergency and permanent invoices

The fix: make the site safe and prevent further damage, which most policies require of you, then photograph everything and keep the damaged items until they have been inspected. Keep emergency work and permanent repair on separate invoices.

The pattern behind all nine

Every one of these is a failure to tell somebody something. The lease was not read to the broker. The new equipment was not added to the schedule. The refit was not mentioned. The empty unit was not declared.

Insurance responds to the business that was described to it, and keeping that description current is a ten minute job a few times a year. That is the whole discipline. The same habit applied to the paperwork you already hold is in the renewal reading guide, and the equivalent list for third party claims is in the liability mistakes guide.

Common questions

How often should the values be reviewed?

At least annually, and whenever you make a significant purchase or change a location. Construction costs move, and the schedule does not move with them.

Is it safe to insure for less if I would never rebuild?

Ask your broker what your policy's provisions do at a partial loss before you decide, because reduced settlements can apply well below the limit. Make it a deliberate decision rather than one you drift into.

The landlord says their policy covers everything. Is that possible?

It is possible that their policy covers the structure, and unlikely that it covers your equipment, stock, or fit-out. Ask for the specific wording rather than the reassurance, and read your lease alongside it.

We had a small loss and paid for it ourselves. Should we still report it?

Ask your broker how your policy's notice condition treats it. Reporting is not the same as claiming, and a small event that grows later is much harder to deal with if nobody was told at the time.

More in Guides

Latest from Costs Desk